skip to Main Content

Request design assistance

The following information is required to provide a recommendation for a simple run of trench drainage. On receipt of this form, ACO will provide a recommendation with hydraulic calculations where necessary.

For more complex layout please contact ACO.

    CATCHMENT HYDRAULICS

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (L/s)

    TRENCH DRAIN INFORMATION

    A (m)

    B (m)

    Please select

    OTHER INFORMATION

    Trench hydraulic flow informationGrating intake performaceLayout schedule and parts listSurface water storage solutionsPlease contact me to discuss

    ADDITIONAL RUNS

    Run 2

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (L/s)

    A (m)

    B (m)

    Please select

    Run 3

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (L/s)

    A (m)

    B (m)

    Please select

    Run 4

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (L/s)

    A (m)

    B (m)

    Please select

    Run 5

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (L/s)

    A (m)

    B (m)

    Please select


    Catchment Area
    Rainfall Intensity
    Ground Slope
    Slope Crossfall
    Central To Width
    Outlet Position
    Catchment Length
    Load Class Table
    SUBSCRIBE
    Close
    SUBSCRIBE
    Close
    Popular Searches Hide Popular Searches