skip to Main Content

Gympie Aquatic Centre, Gympie, Queensland

The new Gympie Aquatic Recreational Centre includes an eight-lane, 50m Olympic Pool and 25m Indoor Heated Pool (open year-round). In addition, the facility includes a water park, a gym, change rooms, administration offices, a conference centre and numerous other amenities.

Project Design Brief

Between the pool areas and the building, designers positioned a wide concourse. For the safety of adults and children, a trench drain with foot friendly grates was selected to ensure effective drainage on a flat and level pavement.

ACO's Solution

Benefits

  • The 0.5% built-in channel slope in the KS100 system provides gravity runoff to the outlets, whilst allowing the surrounding pavements to be constructed level.
  • Stainless 5 Star Heelsafe® Anti-Slip grates provides slip resistance to AS 4586.
  • Grates and edge rails manufactured from corrosion resistant grade 304 stainless steel.
Gympie Aquatic Centre

Other ACO products used:

* Pictured right

Download this case study
SUBSCRIBE
Close
SUBSCRIBE
Close
Popular Searches Hide Popular Searches
Back To Top